6 Power-On Commissioning

1.
Confirm the connection between ESS battery cabinet and inverter before power on
for the first time starting. Turn the isolation switch of ESS battery cabinet and
inverter switch to "on" (refer to inverter manual for specific inverter operation).
2.
Press the start button. The equipment will be self-checked and started. If there is
no fault, the equipment can be used normally.
3.
If the device is not used for a short time, press the start button and the device will
go to sleep mode. If the equipment is not used for a long time (two weeks), in
addition to the above steps, turn the equipment disconnector to "off".