2.7 Installation Procedure
The flow diagram below provides a step-by-step description of the recommended procedure for clear, easy installation of the NCB500
boiler in its final location. A detailed description is given of the procedure in the sequenced sections below:
Water and condensate
Flue gases exhaustion
Electrical connections
16
About the Boiler
Wall-mounting
»
p. 17
pipe connection
»
p. 20
Gas connection
»
p. 24
system installation
»
p. 27
»
p. 32
Setup Wizard
»
p. 39
Final check
»
p. 36
Gas changeover
(if necessary)
»
p. 57
Boiler operation
»
p. 37