Page 1
ITEM #1048297 CEILING-MOUNT DUAL QUARTZ HEATER UTILITECH and logo design are trademarks or registered trademarks of LF, LLC. All rights reserved. MODEL #CZQTV5MLSCN SERIAL NUMBER ______________________________ PURCHASE DATE ________________________________ QUESTIONS, PROBLEMS, MISSING PARTS? Before returning to your retailer, call our customer service department at 1-866-994-4148, 8 a.m.
TABLE OF CONTENTS Product Features & Specifications......................2 Safety Information..........................2 – 3 Installation Instructions ........................4 – 5 Operating Instructions ..........................6 Care and Maintenance ..........................7 Warranty ..............................7 PRODUCT FEATURES & SPECIFICATIONS FEATURES SPECIFICATIONS Top Mounted Control Panel Two Heat Settings: Power Indicator Light* II –...
SAFETY INFORMATION IMPORTANT INSTRUCTIONS: • Do not touch body of heater when in use. This heater is hot when in use, to avoid burns, do not let bare skin touch hot surfaces. If provided, use handles when moving this heater. •...
INSTALLATION INSTRUCTIONS GETTING STARTED: FIRST CHOOSE A MOUNTING INSTALLATION OPTION. WARNING: This unit is intended for use ONLY as a ceiling mounted Mounting to 1 Joist – Figure A heater. Mounting on a wall or sloping surface such as a roof is a risk of fire due to possible overheating of the unit JOIST or igniting nearby combustible materials.
Page 5
INSTALLATION INSTRUCTIONS SUSPENDED CEILING OPTION: Suspended Ceiling – Figure D 1. Select a ceiling tile in the desired location and a mounting installation option (either Swivel or key Slot MOUNTING installation. See previous page for option descriptions). BOARD (Note: heater should be at least 3 feet (0.9m) away from the nearest wall or other combustible material) CEILING TILE...
OPERATING INSTRUCTIONS Inspect heater for damage which may have occurred during shipment. DO NOT operate if any damage is WARNING: noted. Return damaged heater to retailer or factory for repair or replacement. 1. Install heater to an overhead location (SEE INSTALLATION INSTRUCTIONS). 2. Plug heater into 120Volt, 60Hz. AC grounded plug. See "Important Instruction" at the beginning of this book. 3.
CARE & MAINTENANCE CLEANING: Make sure to disconnect the plug from the wall outlet before any servicing is started. Always allow the heater to cool completely. Do not pour water on or submerge any portion of heater or any other liquid. Allow unit to completely dry before plugging the heater in to a receptacle.