Download Print this page

Kit Contents; Knob Installation; Mechanical Damage - Trane KIT09667 Installation Instruction

Power board knob

Advertisement

Kit Contents

There are two knobs for the PTED and PTHD power board included with the KIT09667. This kit also
ships with the replacement Power Board.

Knob Installation

When replacing a control panel knob or the power board on a PTAC remove both knobs currently
on the control panel and replace both with the two knobs contained in KIT09667. This knob kit also
ships with the power board.

Mechanical Damage!

Failure to replace both of the knobs with the new parts or improper installation procedures may
result in the power board being damaged. When not properly installed the knobs could turn past
their stop points and mechanically damage the power board.
Figure 1.
Figure 2.
Note: Always install the knob first, followed by the escutcheon.
4
Install knobs first
Escutcheon cover goes over knobs, not under
NOTICE
PART-SVN85C-EN

Advertisement

loading

This manual is also suitable for:

Brd03075