Adjusting the heating curve
Tap the following buttons:
1.
2.
"Indoor environment"
3. Select the required heating/cooling circuit, e.g.
"Climate circuit 1".
Naming the heating/cooling circuits
In the delivered condition, the heating/cooling circuits
are designated "Climate circuit 1",
"Climate circuit 2" etc.
If the system user prefers, the heating/cooling circuits
can be renamed to suit the specific system.
Tap the following buttons:
1.
2.
"Settings"
Entering the contractor's contact details
The system operator can call up contact details when
required and notify the contractor.
Tap the following buttons:
1.
2.
"Information"
Instructing the system user
The system installer should hand the operating instruc-
tions to the system user and instruct the user in oper-
ating the system. This also includes all components
added as accessories, such as remote controls.
Commissioning, inspection, maintenance
4.
"Heating curve"
5.
for the required value regarding "Slope" and
"Level" respectively, depending on the system
requirements
6.
to confirm
3.
"Rename heating/cooling circuit"
4. Select the required heating/cooling circuit, e.g.
"Climate circuit 1"
5. Type in the required name, e.g. "Ground floor" (1 to
20 characters).
6.
to confirm
3.
"Contractor contact details"
4. Enter contact details.
5.
to confirm
Equipment and functions of the heating system must
be entered in the form in the appendix to the operating
instructions.
The system installer should also provide information
on the required maintenance.
93