Page 1
Installation, Operation, and Maintenance Trane Rental Services Fuel Tanks SAFETY WARNING Only qualified personnel should install and service the equipment. The installation, starting up, and servicing of heating, ventilating, and air-conditioning equipment can be hazardous and requires specific knowledge and training.
NEVER PERFORM ANY Practices SWITCHING, DISCONNECTING, OR VOLTAGE TESTING WITHOUT PROPER ELECTRICAL PPE AND Trane believes that responsible refrigerant practices are ARC FLASH CLOTHING. ENSURE ELECTRICAL important to the environment, our customers, and the air METERS AND EQUIPMENT ARE PROPERLY RATED conditioning industry.
Copyright This document and the information in it are the property of Trane, and may not be used or reproduced in whole or in part without written permission. Trane reserves the right to revise this publication at any time, and to make changes to its content without obligation to notify any person of such revision or change.
Introduction The purpose of this IOM is to detail the proper handing, installation, and maintenance recommendations for Trane Rental Services Fuel Tanks. This equipment has been designed and manufactured for efficient refueling of equipment and/or transportation of fuel. Full load lifting...
Specifications Model Number Description R S DT 1 0 0 0 F 0 A A Rental Services prefix Incremental designator Denotes day tank Design sequence Tank volume Table 1. Specification RSDT1000F0 Capacity 950 gal Double wall Day tank weight w/o fuel 2800 lb Day tank weight with fuel 9400 lb...
Installation and Decommission Please read this document in its entirety before attempting to off-load, install, or operate this tank. Transportation WARNING Heavy Objects! The lifting machinery and each of the cables (chains or slings) used to lift the unit must be capable of supporting the entire weight of the unit.
Operation 5. Connect female end of quick coupler into male end of quick coupler on the pump discharge. WARNING 6. Open fuel feed line/valve on fuel tank. Flammable Fluids! 7. Connect a power supply to the pump (minimum 20 Diesel fuel is flammable and poses a fire hazard. Do not amp rating).
Operation Day Tank To Generator Hose Connections Figure 2. Hand Nozzle Figure 3. Female to Male Quick Coupler Figure 4. Female Quick Coupler to Threaded End Figure 5. Male Quick Coupler to Threaded End Figure 6. Swivel-Type Coupling SRV-SVX006B-EN...
Page 12
For more information, please visit trane.com or tranetechnologies.com. Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications without notice. We are committed to using environmentally conscious print practices.