Power Up; Configuration; Clear To Send (Cs) - Sw 1; Down - Normal - ADTRAN DSU 56/64 User Manual

Data service unit
Table of Contents

Advertisement

Chapter 2. Installation

Power Up

The DSU 56/64 is equipped with a captive six-foot power cord that
is terminated with a three-prong plug for connecting to a grounded
power receptacle.
Ensure that a grounded, 115 VAC, 60 Hz receptacle is used for powering
the DSU 56/64 unit.

CONFIGURATION

The DSU 56/64 has eight options for controlling the operation of
both the network and DTE interfaces. These options are selected by
setting individual switches on either position DIP switch that is
accessible from the rear panel. A chart showing the options and
switch settings is attached to the bottom of the unit.

Clear To Send (CS) - SW 1

Down - Normal

In the down position, CS follows the RS lead with the selected
amount of delay. The only exceptions to this occur when network
or test conditions prevent data from being transferred over the DTE
interface. During these conditions CS is turned off.

Up - On

CS is forced on all the time.

Clear to Send Delay (CS Delay) - SW 2

Switch Position

RS to CS Delay

Down - Short

250

Up - Long

10 ms + 125
2-2
µ
µ
s + 125
s
µ
s
DSU 56/64 User Manual
61200062L1-1

Advertisement

Table of Contents
loading

Table of Contents