Download Print this page

Weider WESY97300 User Manual page 10

Hide thumbs Also See for WESY97300:

Advertisement

13. Press two 1" x 2" Inner Caps (83) into the
indicated end of the Squat Arm (79).
Lubricate a 3/8" x 3 1/4" Bolt (85). Attach the
Squat Arm (79) to the Front Upright (42) with
the Bolt and a 3/8" Nylon Locknut (21).
Attach a Handle (92) to one side of the Squat
Arm (79) with a 5/16" x 2 1/2" Bolt (22), two
5/16" Washers (8), a 1/2" x 17/32" Spacer (94),
and a 5/16" Nylon Locknut (3).
Attach the other Handle (92) to the other side
of the Squat Arm (79) in the same manner.
14. During steps 15 through 39, refer to the
CABLE DIAGRAMS on pages 26 and 27 of
this manual to verify proper cable routing.
Before beginning this section, identify the
High Cable (23), the Low Cable (86), the
Rear Cable (95), and the Press Cable (58) by
comparing the lengths and ends of the
cables.
IMPORTANT: While assembling the cables,
do not overtighten the bolts and nuts
securing the pulleys. The pulleys must be
able to turn freely.
15. Locate the High Cable (23). Wrap the High
Cable around a 3 1/2" Pulley (15). Attach the
Pulley to the Top Frame (55) with a 3/8" x
3.3/4" Bolt (71) and a 3/8" Nylon Locknut
(21). Be sure that the end of the Cable with
the ball is on the indicated side of the
Pulley and that the Cable is between the
Pulley and the hook.
All manuals and user guides at all-guides.com
10
13
22
8
83
22
94
83
8
8
92
3
8
94
79
3
14
15
55
21
15
Ball
71
Hook
92
21
42
85
Lubricate
86 (148")
23 (159")
58 (47")
95 (141")
23

Advertisement

loading