Standard Version Unit - Control Panel; Electrical Connections - Carrier 42GW Installation Manual

“hydronic global cassette” fan coil units
Hide thumbs Also See for 42GW:
Table of Contents

Advertisement

42 GW
Motorized valve and control
• If these connections are not made as described the drain
pan condensate may overflow.
• Valves should only open when the fan motor is working, i.e.
when one of TB1 terminals 1 or 2 or 3 is supplied from TB1
terminal 4.
• The optional electric heater (mod. 42GWE) which can only be
factory installed, must only be energized when the fan is
working.
• The optional electric heater which must be factory installed on
model 42GWE, works only if TB1 terminals 5-6 are supplied
from TB1 terminal 4.

Electrical connections

We recommend to remove the main board from the electric
panelboard for better access to electric connections.

STANDARD version unit - Control panel

C
CV
CG
CP
A
B
mod. 004 - 008 - 010
Capacitor
Ground connection screw
Board
Relay board E-HTR (only on
models with electric heater)
Holes for panel fixing screws
Auxiliary board (accessory)
• The water discharge pump should work every time the
cold water valve is opened, supplying TB1 terminal 7 and
8 from TB1 terminal 4.
• When the system is filled with water, verify all couplings
for tightness.
• The manufacturer does not accept responsibility for the
tightness of the field - installed valve assembly and this
is not tested in the factory. He declines any responsibility
for non functioning of these assemblies and for damage
due to dripping.
C
A
B
CV
Fan connector
Float connector
CG
CP
Pump connector
CV
CG
CP
mod. 012 - 016 - 020
A. Electric heater supply connection
B. Unit power supply connection
C. Polarised connector
E N G L I S H
GB - 11