Download Print this page

ADTRAN Total Access 300 Series Manual page 3

Hide thumbs Also See for Total Access 300 Series:

Advertisement

Use the Pin‐Out information in the table below as needed.
Pin-Out
Description
Power/Alarm
1
LOW BAT
2
BAT MIS
3
REP BAT
4
ON BAT
5
SIG RTN
6
12V RTN
7
+12VDC 
!
CAUTION
Use caution when routing wires and cables. Avoid severe bending and
routing over sharp edges. Use grommets when possible to avoid wear on
cable insulation.
1. Install the UPS cable that runs from the SFU ONT to the Power/
Alarm Connector of the UPS via the customer provided PVC con‐
duit (or method used by your local telephone company practice).
2. Close the electronics module closed and tighten the security screw 
with the 5/32 Hex tamper proof bit.
3. If necessary, tie wrap both the #6 ground wire and the UPS cable 
run to the Buried Fiber Drop riser conduit.
POTS Connection
The telephone service or POTS connections can be made with either two‐
screw terminal bridges, or RJ‐11 connectors.
If the two‐screw terminal bridges are used the RJ‐11 jacks provide a 
diagnostic test point. Inserting an RJ‐11 jack (i.e., telephone cable or 
telephone test set) will connect the telephone set to the SFU ONT and also 
disconnect the subscriber service from the SFU ONT providing fault 
isolation to the SFU or premises wiring.
To terminate the POTS lines on the two‐screw terminal bridges complete 
the following:
1. Trim each wire to length and strip insulation. Identify each pair in 
the service cable.
2. Loosen the screws from the 
3. Wrap the appropriate wire around the appropriate screw and 
tighten the screws to secure the connections.
POTS can also be connected directly to the RJ‐11 jack. In this case the two‐
screw terminal bridges become isolated and are not used.
RF Connection
Route the RF cable through the large grommet at the bottom of the 
enclosure and attach it to the RF connector located on bottom the 
electronics Module. Refer to the illustration on the first page as needed.
SWRD Installation
Refer to the figure below and complete the following steps:
64187712G2-22C
Pin-Out
UPS
1
 2
3
4
5
6
7
TIP 
RING 
(green) and 
(red). 
Mounting
Point
LAN
LED
B
A
A: TV/DHCT Port. Starting at the home set-top connect to the data network
via the SWRD's TV/DHCT port.
B: ONT/Power Port. Downstream video and power from ONT.
C. LAN Connection Port. Data connection for computer network.
D. ONT Connection Port. Data connection to the ONT and power from the ONT.
1. When not in use, place water sealing F‐connector boots or shrink 
tubing on "A" and "B".
2. Attached the SWRD using the Mounting Points to the customer's 
premesis in close proximity to the SFU ONT.
3. Ground the SWRD by attaching one end of an 18‐gauge wire (or 
larger) to the Earth Ground screw. Attach the other end of the wire 
to the same ground as the SFU ONT.
4. Remove the retaining screw that holds the Connector Cover to the 
SWRD, and remove the Upper and Lower Rubber Seals.
5. Connect power to the SWRD by connecting the RJ‐45
of the SFU ONT to the RJ‐45 
SWRD. Refer to the following table as needed:
SWRD RJ-45 Pin-Out
Pin
Name
Description
1
TX+
Transmit Positive
2
TX‐
Transmit Negative
3
RX+
Receive Positive
4
Power
+12 VDC
5
Power
+12 VDC
6
RX‐
Receive Negative
7
Ground
N/A
8
Ground
N/A
6. Once power is connected to the SWRD, the Power LED will 
illuminate steady. 
7. Position the RJ‐45 cables in the slots in the Upper and Lower Rubber 
Seals, and reinstall them in the SWRD.
8. Install the Connector Cover and secure the Connector Cover using 
the Retaining Screw. Torque the screw to 5 in‐lbs.
9. Using coaxial cable, connect the TV/DHCT port (A) of the SWRD to 
the set‐top network inside the customer's home.
10. Using coaxial cable, connect the RF Drop from the SFU ONT to the 
ONT/Power Port (B) on the SWRD.
11. Tie wrap all wires to the appropriate locations to provide maximum 
stress relief and minimize any potential hazards to the connections.
Mounting
Points
ONT
LED
(Connector Cover, Screw
and Rubber Seals removed
Earth
D
C
for illustration purposes)
Ground
ETH 2 SWRD
ONT + PWR
 Connection Port (D) of the 
Color Code
White/Orange
Orange
White/Green
Blue
White/Blue
Green
White/Brown
Brown
Mounting
Point
Power
LED
port 
3

Advertisement

loading

This manual is also suitable for:

Total access 362s1187712g21187770g11187771g1