Appendix A Installation Tools And Supplies - GE Kelman Minitrans Installation Manual

Transformer oil dissolved gas and moisture monitor
Hide thumbs Also See for Kelman Minitrans:
Table of Contents

Advertisement

The tools and supplies for a product installation are listed below. If GE performs the
installation, the GE installation engineer will provide these items:
A.1
GE-supplied Items
Qty
Description
2
9
/
1
30 cm (12 in.) Adjustable wrench
1
35 – 40 cm (14 in.) Pipe wrench
1
/
1
1
¼ in. flat blade screwdriver
1
#2 Phillips screwdriver
1
¼ in. Tubing bender
1
¼ in. Tubing cutter
1
Non-metallic tape measure
1
Permanent marker (fine tip)
1
22 – 14 Gauge wire cutter/stripper
1
Small diagonal cutting pliers
1
Quality vacuum pump with approximately 3 ft of clear ¼ in. tubing fitted with a ¼ in.
compression fitting at the end of the tubing
1 roll
12 mm (½ in.) width PTFE pipe sealing tape or PTFE pipe compound
25
30 cm (12 in.) Nylon UV-resistant cable ties
1 bag
¼ in. tubing P clamps
1
Laptop computer to run the Minitrans commissioning tool and Transcom software for
downloading and interpreting the results of the gas analysis. Minimum specification:
Windows® 2000 or Windows® XP operating system, PII 400 MHz processor, 128 MB of
RAM and 1.2 GB hard drive space, 28.8 Kbps modem or faster and USB 1.1 or faster.
A.2
Customer-supplied Items
The following tools and supplies are needed on site to secure the mounting stand (if
used), tighten the 2 in. pipe fittings (if used) and complete the installation. GE is unable
to bring the following items due to size and weight restrictions, so the customer should
provide them.
Qty
1
1
1
1
1
24
MA-005 - Minitrans Installation Manual - Rev 4.5
Appendix A
in. Combination wrench (must be imperial
16
flat blade screwdriver
8
Description
12 mm (½ in.) capacity hammer drill with 9.5 mm (
36 in. pipe wrench if large fittings are used to provide oil to the product
Scaffolding, lift or approved platform to obtain access to valves (if needed)
Suitable vessel to collect at least 4 litres of waste oil during the commissioning
process
Absorbent cloths
M8 threaded fasteners with a recommended minimum length of 80 mm for the
concrete pad
Installation Tools and Supplies
9
/
in.)
16
3
/
in.) masonry bit
8
13-Aug-20
Page 36 of 86