Verifying Clearances (Clearance Area) - Trane LIFT 162-P-1204-P Installation Operation & Maintenance

Water-cooled heat pumps with scroll compressors for hot water production at very high temperatures heating capacity 77-550 kw
Table of Contents

Advertisement

Place a rigid rubber band between the base of the machine and the support surface.
Verify that the support surface withstands the weight of the unit.
Provide a supporting slab of proportional dimensions with the unit if resting on unstable
ground.
The slab must be horizontal and able to withstand approximately 200% of the operating
weight of the machine.
If necessary, use shock absorbers (rubber or spring).

3.4 Verifying clearances (clearance area)

L1
L2
W1
W2
L1
L2
W1
W2
• Installation, in addition to the indicated spaces, must enable access to the authorised
personnel for maintenance operations and must take into account the safety distances from
any other equipment installed near the machine.
12
0
800
300
300
500
500
800
500

Hide quick links: