Arrow Storage Products EZEE SHED EZ10872HVCREU Owner's Manual & Assembly Manual page 39

10' x 8'
Hide thumbs Also See for EZEE SHED EZ10872HVCREU:
Table of Contents

Advertisement

Step 6: Roof pre-assy
You will need for this page:
80121
(QTY: 8)
ARROW TO TOP
Always cover
the Arrows.
80121
HOLES
ROOF CHANNEL ASSEMBLY
(Painted)
LARGE HOLES IN
CHANNELS FACE
DOWN
1. Angle Roof Channel Assembly
Channel
11039
2
12
11014
Roof Panel
Roof Panel
Left
6
Make two (2) Roof Sections.
11014
11014
80119
2. Continue to align Roof Channel
Assembly onto Roof Panels
Roof Panels
80121
2
11015
Roof Panel
Roof Channel
Right
Assembly
Overlap Panels and
7
Align Ends. Snap
panel ribs together.
11014
11014
VERIFY PANELS ARE POSITIONED
IN CORRECT SEQUENCE BY PART
NUMBER
Channel
Roof Panels
38
4
4
11039
Fascia Trim
MUST USE FLAT SOLID
SURFACE. DO NOT SNAP
ON GROUND OR GRASS
11014
11014
Attach Roof Channel
8
Assemblies onto top
and bottom (Large
holes face down).
11013
ROOF CHANNEL ASSEMBLY
(Painted)
3. Complete Roof Channel
Assembly Install.
Channel
11015
9
Attach Fascia Trim onto each side
using four (4) washers and screws.
38CH
HOLES
11015
Roof Panels
11039

Advertisement

Table of Contents
loading

Table of Contents