Section 3. Unit Preparation

3.1 Prepare The Unit For Installation
STEP 1 - Check for damage and report promptly to
the carrier any damage found to the unit.
The charge port can be used to check to be sure
the refrigerant charge has been retained during
shipment.
STEP 2 - Use a hex head driver to remove the two
screws holding the two clips to the pallet and lift off
the clips.

Section 4. Setting the Unit

4.1 Pad Installation
When installing the unit on a support pad, such as a
concrete slab, consider the following:
• The pad should be at least 1-2" larger than the unit
on all sides.
• The pad must be separate from any structure.
• The pad must be level.
• The pad should be high enough above grade to
allow for drainage.
• The pad location must comply with National, State,
and Local codes.
For other applications refer to Pub. No. APP-
APG015-EN or APP-APG016-EN.
18-AC78D1-6
5