A. GREASING (See Page 7-11)
1. Front Joint Pins (Incl. around the swing post)
2. Bucket and Link Pins
3. Swing Bearing
4. Swing Internal Gear
5. Control Lever Universal Joint
NOTE:
Grease all submerged pins after operating in water.
Grease all pins daily during break-in operation for 50 hours.
Grease all pins every 100 hours only during first time operation up to 500 hours.
B. ENGINE (See Page 7-17)
1. Engine oil
Oil Level Check
Change
2. Replacement of engine oil filter
NOTE:
The oil life is shortened more than normal under high temperature operating, shorten the mainte-
nance interval.
For the first time only.
C. TRANSMISSION (See Page 7-19)
1. Travel Reduction
Gear
D. HYDRAULIC SYSTEM (See Page 7-21)
1. Check Hydraulic Oil Level
2. Drain Hydraulic Oil Tank Sump
3, Change Hydraulic Oil
4. Clean Suction Filter
5. Replace Full Flow Filter Element
6. Replace Pilot Filter Element
7. Check Hoses and Lines
NOTE:
Hydraulic oil changing intervals differ according to kind of hydraulic oils used.
See recommended oil chart.
For the first time only.
Parts
Parts
Parts
Oil Level Check
Change
Parts
for leaks or looseness
for cracks, bend, etc.
MAINTENANCE
Quantity
9
5
1
1
2
Quantity
3.1 L
(3.2 US qt)
1
Quantity
0.25 L×2
(0.26 US qt)×2
Quantity
1
1
30L
(7.9Us gal)
1
1
1
7-7
Interval (hours)
8
50
100
250
Intervals (Hours)
8
50
100
250
Interval (hours)
8
50
100
250
Interval (hours)
8
50
100
250
When changing hydraulic oil