Vaillant ecoFIT sustain Series Installation And Maintenance Instructions Manual page 49

Table of Contents

Advertisement

SERVICE & INTERIM BOILER WORK RECORD
It is recommended that your boiler and heating system are regularly serviced and maintained, in line with manufacturers' instructions, and that the appropriate service /
interim work record is completed.
Service provider
When completing a service record (as below), please ensure you have carried out the service as described in the manufacturers' instructions. Always use the
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Company name:
o
Telephone N
:
Gas Safe registration N
Max rate CO
ppm
CO ²
Min rate
CO
ppm
CO ²
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
m
3
/h
OR
Yes
delete as appropriate
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
Max rate CO
ppm
CO ²
Min rate
CO
ppm
CO ²
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
m
3
/h
OR
Yes
delete as appropriate
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
Max rate CO
ppm
CO ²
Min rate
CO
ppm
CO ²
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
m
3
/h
OR
Yes
delete as appropriate
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
© Heating and Hotwater Industry Council (HHIC)
0020230529_06 ecoFIT sustain Installation and maintenance instructions
Date:
delete as appropriate
o
:
% CO/CO ²
% CO/CO ²
yes
ft
3
/h
No
yes
n/a
Date:
delete as appropriate
o
:
% CO/CO ²
% CO/CO ²
yes
ft
3
/h
No
yes
n/a
Date:
delete as appropriate
o
:
% CO/CO ²
% CO/CO ²
yes
ft
3
/h
No
yes
n/a
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Company name:
o
Telephone N
:
Gas Safe registration N
Max rate CO
ppm
CO ²
Min rate
CO
ppm
CO ²
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
m
3
/h
OR
Yes
delete as appropriate
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
Max rate CO
ppm
CO ²
Min rate
CO
ppm
CO ²
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
m
3
/h
OR
Yes
delete as appropriate
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
SERVICE/INTERIM WORK ON BOILER
Engineer name:
Company name:
Telephone N
o
:
Gas Safe registration N
Max rate CO
ppm
CO ²
Min rate
CO
ppm
CO ²
undertaken in accordance with manufacturers'
instructions, and readings are correct?"
Gas rate:
m
3
/h
OR
Yes
delete as appropriate
System inhibitor concentration has been checked and
appropriate action taken, in accordance with BS 7593
and boiler manufacturers' instructions. *
Comments:
Signature:
instructions and BS 7593. It is only acceptable to not have undertaken this if the service engineers
attendance visit was in between annual services to attend a non-water facing component.
Date:
delete as appropriate
o
:
% CO/CO ²
% CO/CO ²
yes
ft
3
/h
No
yes
n/a
Date:
delete as appropriate
o
:
% CO/CO ²
% CO/CO ²
yes
ft
3
/h
No
yes
n/a
Date:
delete as appropriate
o
:
% CO/CO ²
% CO/CO ²
yes
ft
3
/h
No
yes
n/a
www.centralheating.co.uk
49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents