Start-Up Operations - Lennox CBX25UH Series Installation And Service Procedure

Table of Contents

Advertisement

Start-Up Operation
NOTE - Refer to outdoor unit installation instructions for
system start-up instructions and refrigerant charging
instructions.
PRE‐START‐UP CHECKS
S
Is the air handler properly and securely installed?
S
If horizontally configured, is the unit sloped up to 5/8
inch toward drain lines?
S
Will the unit be accessible for servicing?
S
Has an auxiliary pan been provided under the unit with
separate drain for units installed above a finished
ceiling or in any installation where condensate overflow
could cause damage?
S
Have ALL unused drain pan ports been properly
plugged?
Figure 29. Unit Wiring Diagram - Electric Heat and Air Handler
S
Has the condensate line been properly sized, run,
trapped, pitched, and tested?
S
Is the duct system correctly sized, run, sealed, and
insulated?
S
Have all cabinet openings and wiring been sealed?
S
Is the indoor coil factory‐installed TXV properly sized
for the outdoor unit being used?
S
Have all unused parts and packaging been disposed
of?
S
Is the filter clean, in place, and of adequate size?
S
Is the wiring neat, correct, and in accordance with the
wiring diagram?
S
Is the unit properly grounded and protected (fused)?
S
Is the thermostat correctly wired and in a good
location?
Page 20

Advertisement

Table of Contents
loading

Table of Contents