__ 14. Install two clips in the back frame B .
__ 15. Attach the other end of the cable management arm to the back frame by installing the two screws
C where the clips are located.
__ 16. The rack shelf and rail assembly installation is complete.
__ 17. Continue with the instructions.
Remove devices before lifting the system unit into the rack
To safely lift your unit onto the rack shelf, use the instructions to remove devices from the unit. Place
devices that you remove in the electrostatic discharge bags that are provided to prevent damage.
After removing the devices to get the system unit to an acceptable weight, three people are needed to
safely lift the system unit onto the rack shelf.
Continue with the following instructions.
14
270, 800, 810 In Rack Installation Instructions V5R3