STEP-7
1. Install the locking Knob (#53) to the upper hole to fix the Rower by threading in clock-wise
(Since the rower sags a the fulcrum, it helps to slightly raise the middle to insert the knob and tighten.)
STEP-8
1. Assemble the pedals to the Pedal axel prior to installing to the Main Frame.
2. Secure the Left Pedal (#14L), and Right Pedal(#14R) to Pedal Axle (#72), Washer (#73) and Allen bolt(#74) to
assemble to the Pedal support tube(#17).
14R
73
73
74
72
© IMPEX INC.
14L
72
74
74
73
17
2X
4X
4X
74
2X
73
10
53
www.marcypro.com