Commissioning; To Perform A Test Run; To Perform A Test Run Using The User Interface; Disposal 12 - Daikin FVXM25A2V1B Installation Manual

Hide thumbs Also See for FVXM25A2V1B:
Table of Contents

Advertisement

9 Commissioning

9
Commissioning
NOTICE
ALWAYS operate the unit with thermistors and/or pressure
sensors/switches. If NOT, burning of the compressor might
be the result.
9.1

To perform a test run

Prerequisite: Power supply MUST be in the specified range.
Prerequisite: Test run may be performed in cooling or heating
mode.
Prerequisite: Test run should be performed in accordance with the
operation manual of the indoor unit to make sure that all functions
and parts are working properly.
1 In cooling mode, select the lowest programmable temperature.
In heating mode, select the highest programmable temperature.
Test run can be disabled if necessary.
2 When the test run is finished, set the temperature to a normal
level. In cooling mode: 26~28°C, in heating mode: 20~24°C.
3 The system stops operating 3  minutes after the unit is turned
OFF.
9.1.1
To perform a test run using the user
interface
1 Press
to switch the system on.
2 Press the middle of
and
3 Press
twice to choose
.
Result:
on the display indicates that the test run is selected. Test
run operation will stop automatically after about 30 minutes.
4 To stop operation sooner, press the ON/OFF button.
10
Disposal
NOTICE
Do NOT try to dismantle the system yourself: dismantling
of the system, treatment of the refrigerant, oil and other
parts MUST comply with applicable legislation. Units
MUST be treated at a specialised treatment facility for
reuse, recycling and recovery.
11

Technical data

▪ A subset of the latest technical data is available on the regional
Daikin website (publicly accessible).
▪ The full set of latest technical data is available on the Daikin
Business Portal (authentication required).
Installation manual
12
simultaneously.
and confirm selection by pressing
11.1

Wiring diagram

11.1.1

Unified wiring diagram legend

For applied parts and numbering, refer to the wiring diagram on the
unit. Part numbering is by Arabic numbers in ascending order for
each part and is represented in the overview below by "*" in the part
code.
Symbol Meaning
Symbol Meaning
Circuit breaker
Connection
A
,
Connector
Earth
Field wiring
Fuse
Indoor unit
INDOOR
Outdoor unit
OUTDOOR
Residual current
device
Symbol
Colour
Symbol
BLK
Black
ORG
BLU
Blue
PNK
BRN
Brown
PRP, PPL
GRN
Green
RED
GRY
Grey
WHT
YLW
Symbol
A*P
BS*
BZ, H*O
C*
AC*, CN*, E*, HA*, HE*, HL*,
HN*, HR*, MR*_A, MR*_B, S*, U,
V, W, X*A, K*R_*, NE
D*, V*D
DB*
DS*
E*H
FU*, F*U, (for characteristics,
refer to PCB inside your unit)
FG*
H*
H*P, LED*, V*L
HAP
HIGH VOLTAGE
IES
IPM*
K*R, KCR, KFR, KHuR, K*M
L
Protective earth
Protective earth (screw)
Rectifier
Relay connector
Short-circuit connector
Terminal
Terminal strip
Wire clamp
Colour
Orange
Pink
Purple
Red
White
Yellow
Meaning
Printed circuit board
Pushbutton ON/OFF, operation
switch
Buzzer
Capacitor
Connection, connector
Diode
Diode bridge
DIP switch
Heater
Fuse
Connector (frame ground)
Harness
Pilot lamp, light emitting diode
Light emitting diode (service
monitor green)
High voltage
Intelligent eye sensor
Intelligent power module
Magnetic relay
Live
CVXM20A + FVXM25~50A
Split system air conditioners
3P477070-2M – 2021.09

Advertisement

Table of Contents
loading

Table of Contents