Stanley MB10 User Manual page 10

Mounted hydraulic breaker
Table of Contents

Advertisement

Greasing the tool bit without down pressure on the
breaker results in grease filling the space between
the piston and the tool bit. When the breaker is next
activated, the piston will strike the grease at a speed
which will pressurize the grease resulting in seal and
grease zerk failure.
SECURING THE TOOL BIT
1. The tool retainer is shipped installed in the breaker.
2. Drive out the tool retainer.
3. Grease the top area of the tool bit as shown in the
illustration on page 9.
4. Install the tool bit making sure the notch is aligned
with the lower body retainer pin holes.
5. Install the tool retainer.
LOW TEMPERATURE WARM-UP
10 ► MB10 User Manual
OPERATION
Piston in down position,
pressurized by Nitrogen in
accumulator
No gap between
tool bit and piston
Tool bit pushed up
against the piston
Gap - grease will ll
this space
Tool bit NOT pushed up
against the piston
Always wear eye protection when installing or
removing the tool retaining pin.
PROCEDURE
1. After starting the carrier, warm-up the hydraulic sys-
tem at engine idle until hydraulic lines are warm to
the touch.
2. With the carrier at idle and the breaker suspended
in the air or with minimal down pressure, turn on the
breaker to gradually warm up its internal compo-
nents.
3. When the hydraulic system and breaker are warm,
proceed with operation.
LONG TERM STORAGE
1. Remove the tool bit, clean the tool stop and the low-
er bushing. Thoroughly coat the surfaces of the tool
stop and the lower bushing with grease.
2. If hoses are attached to the breaker, install plugs
on the hose ends. If hoses are removed from the
breaker, install plugs on the hose ends and install
plugs in the breaker IN and OUT ports.
3. Store the breaker in a vertical position. Do not store
the breaker horizontally for extended periods.

Advertisement

Table of Contents
loading

Table of Contents