Refrigerant Charge Size; Refrigerant Replacement Requirements; Evacuation; Ambients - Follett C20001 Operation And Service Manual

Hide thumbs Also See for C20001:
Table of Contents

Advertisement

Refrigeration charge
All service on refrigeration systems must be performed in accordance with all federal, state and local laws. It is the
responsibility of the technician to ensure that these requirements are met. Recharging ice machine to other than
factory specifications will void the warranty.
R404A ice machine charge specifications
Model
HCC/HMC1000A (air-cooled)
HCC/HMC1000W (water-cooled)

Refrigerant replacement requirements

1. Non-contaminated refrigerant removed from any Follett refrigeration system can be recycled and returned to
the same system after completing repairs. Recycled refrigerant must be stored in a clean, approved storage
container. If additional refrigerant is required, virgin or reclaimed refrigerant that meets ARI standard 700-88
must be used.
2. In the event of system contamination (for example, a compressor burn out, refrigerant leak, presence of
non-condensibles or moisture), the system must be repaired, evacuated and recharged using virgin or
reclaimed refrigerant that meets ARI standard 700-88.
3. Follett Corporation does not approve of recovered refrigerants. Improper refrigeration servicing procedures
will void the factory warranty.

Evacuation

Evacuate the system to a level of 500 microns. When the 500 micron level is reached, close all valves. Allow the
system to sit for approximately 20 minutes. During this period the system pressure should not rise. If the system
pressure rises and stabilizes there is moisture in the system and further evacuation is needed. If the pressure
continues to rise check the system for leaks.

Ambients

Air temperature
1
Water temperature
2
Ambient air temperature is measured at the air-cooled condenser coil inlet.
1
Ambient water temperature is measured in the ice machine water reservoir.
2

Ice capacity test

Ice machine production capacity can only be determined by weighing ice produced in a specific time period.
1. Replace all panels on ice machine.
2. Run ice machine for at least 15 minutes.
3. Weigh and record weight of container used to catch ice.
4. Catch ice for 15 or 20 minutes.
5. Weigh harvested ice and record total weight.
6. Subtract weight of container from total weight.
7. Convert fractions of pounds to decimal equivalents (ex. 6 lbs 8oz = 6.5 lbs).
8. Calculate production using following formula:
1440 min. x wt. of ice produced
Total test time in minutes
9. Calculated amount per 24 hours should be checked against rated capacity for same ambient and water
temperatures in Ice Production Tables.
Charge
24oz (652g)
15oz (426g)
Minimum
50 F/10 C
45 F/7 C
=
Production capacity/24 hr.
24
Refrigerant type
R404A
R404A
Maximum
100 F/37.8 C
90 F/32.2 C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Hmc1000aHcc1000wHmc1000wHcc1000aC33984

Table of Contents