Viessmann Vitocrossal 100 Installation Instructions For Contractors page 7

Gas condensing boiler with matrix cylinder burner open flue and room sealed operation
Table of Contents

Advertisement

Preparing for installation
Transport dimensions
The boiler is rolled backwards to the installation site on
its castors. The handling dimension therefore corre-
sponds to the boiler width of 680 mm.
With boiler sizes up to 160 kW, base rail
ing bracket with castor
B
ways are particularly narrow. In such cases, the boiler
then has to be moved at an angle with a transport aid.
B
a
Fig. 3
Base rail
A
Retaining bracket with castor
B
(cont.)
and retain-
A
can be taken off if passage-
A
Handling dimension a
kW
80
mm
450
120 and 160
570
7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ci1

Table of Contents