Download Print this page

Pcb - Daikin RKC09NV2S Service Manual Removal Procedure

1.5/2.0/2.5/3.5 kw class 9000/12000 btu/h class

Advertisement

PCB

4. PCB
Warning
Step
1
Cut the clamp and
remove the screw from
the terminal board.
2
Remove the 2 earth /
ground screws.
3
Release the terminal
board harnesses from
the hook inside the
electrical box.
4
Cut the clamp to
release the relay
harness for the
compressor.
5
Remove the screw and
unfasten the hook on
the left side to remove
the electrical box cover.
10
Be sure to wait for 10 minutes or more after turning off all power supplies before
disassembling work.
Procedure
Earth / ground
screw
Clamp
Relay harness
Terminal board
harness
Electrical box cover
Hook
Terminal board
Clamp
(R21307)
Hook
(R21309)
(R21310)
Si001416E
Points
When reassembling, fit the
projection at the back of the
terminal board into the hole
on the mounting plate.
Projection
Mounting
plate
(R21308)
Removal Procedure

Hide quick links:

Advertisement

loading