6. Installation

6.1

Unpacking

CAUTION
The vacuum circuit-breaker may be lifted only by
means of suitable gear attached to the correct points.
Non-compliance can lead to damage.
The 3AF 01 outdoor vacuum circuit-breaker is
despatched in one crate. The equipment is protected by
polyethylene sheet while packing. The packing case is
marked with the breaker serial number. A list of items
kept in the case is enclosed with it.
The case contains the base frame (P-2, Fig. 7) with three
pole assemblies (P-1, Fig. 7). These are mounted on
mechanism housing (P-G, Fig. 1). This case also contains
support structure, the foundation bolts (P-4, Fig. 5) nuts
(P-1, Fig. 5), plain washers (P-3, Fig. 5) and spring
washers (P-2, Fig. 5) and any other loose items ordered
separately. The CB is packed and transported with
vacuum interrupters in the open condition. Lifting
instructions and consignee address are marked on the
case.
6.2

Receiving the Equipment

The case nos. should be checked with the despatch
challans before acceptance. The packing case should be
carefully inspected for damage. This should be
immediately brought to the notice of the forwarding
agent and an inventory of damages should also be made
in his presence.
CAUTION
1. Use crane to lift the packing case.
2. Put slings on the marked portion on the packing
case
3. Do NOT topple or tumble the packing case.
6.3

Storage and Handling

It is recommended that the equipment, after removal from
the packing case, be stored in a clean, sheltered area. Care
should be taken against the ingress of water in the
packages. For long time storage, ensure that the space
heater is switched ON.
Refer Fig. 8 for the handling and shifting in a safe manner.
10
1. Control panel
2. Local/Remove selector switch
3. C.B. ON/OFF switch
4. Terminal blocks
5. Steel structure
6. Operating mechanism
7. Pull rod
8. Transport cover
9. Eye bolt
10. Lever
11. Pin
12. Lock washer
13. Glass window for viewing
mechanical indications
14. Operating mechanism housing
Fig. 10 Baseframe, operating mechanism and control
panel
6.4

Erection

The following care will be taken for proper & safe
operation of the breaker.
(1)
Use only the bolts supplied.
(2)
Use torque wrench for assembly since
unchecked tightening can result in damage to or
loosening of joints.
The necessary torque for screwed joints are as follows:
S. No. Type of Joint
Size of Bolt
Property Class
1
Steel to Steel
2
Steel with insulator
3
Busbar Joint
4
Busbar with Steel
Note: The values given in the table above are for
Tightening Torques. For testing the joint, 70% of above
values are to be considered as Checking Torque.
Torque (Nm) ± 10%
M8
M10
M12
M20
6.6
8.8
8.8
8.8
32
65
115
16
32
77
170
20
40
70
20
40
70

Advertisement

Table of Contents
loading

This manual is also suitable for:

3af 01 423af 01 433af 01 443af 01 453af 01 47

Table of Contents