Joint Cementing Procedure - Lennox ML193UH030XE36B Installation Instructions Manual

Hide thumbs Also See for ML193UH030XE36B:
Table of Contents

Advertisement

Vent Pipe
Input Size
Dia. in.
1-1/2
6
2
030,
045
2-1/2
3
1-1/2
6
2
070
2-1/2
3
2
090
2-1/2
3
2
110
2-1/2
3
NOTE - Standard Terminations do not include any vent pipe or elbows external to the structure. Any vent pipe or elbows external to the structure must be included in total
vent length calculations. See vent length tables.
* Kits must be properly installed according to kit instructions.
1Requires field-provided outdoor 1-1/2" exhaust accelerator.
2Concentric kits 71M80 and 44W92 include 1-1/2" outdoor accelerator, when uses with 030, 045 and 070 input models. When using 1-1/2 inch vent pipe, transistion to 2"
pipe before installing concentric kit.
3 Flush mount kits 51W11 and 51W12 includes 1-1/2 in. outdoor exhaust accelerator, required when used with 030, 045, 070 and 090 input models.When using 1-1/2" vent
pipe, transition to 2" pipe before installing flushmount kit.
4 Termination kits 30G28, 44W92, 4493 and 81J20 are certified to ULC S636 for use in Canada only.
5 See table 8 for vent accelerator requirements.
6 Requires field provided 2" to 1-1/2" reducer.

Joint Cementing Procedure

All cementing of joints should be done according to the
specifications outlined in ASTM D 2855.
NOTE - A sheet metal screw may be used to secure the
intake pipe to the connector, if desired. Use a drill or self
tapping screw to make a pilot hole.
DANGER
DANGER OF EXPLOSION!
Fumes from PVC glue may ignite during system check.
Allow fumes to dissipate for at least 5 minutes before
placing unit into operation..
1 - Measure and cut vent pipe to desired length.
2 - Debur and chamfer end of pipe, removing any ridges
or rough edges. If end is not chamfered, edge of pipe
may remove cement from fitting socket and result in a
leaking joint.
OUTDOOR TERMINATION USAGE*
STANDARD
Wall Kit
Flush
Mount Kit
2 inch
51W11
22G44
(US)
(US)
51W12
30G28
4
(CA)
(CA)
YES
YES
3
YES
YES
3
YES
YES
3
YES
YES
3
YES
YES
3
YES
YES
3
YES
YES
3
YES
YES
3
YES
3
YES
3
YES
3
YES
YES
YES
TABLE 3
3 inch
Field
44J40 (US)
Fabricated
81J20
4
(CA)
YES
YES
1
5
YES
YES
1
5
YES
YES
1
5
YES
YES
1
5
YES
YES
1
5
YES
YES
1
5
YES
YES
1
5
YES
YES
1
5
YES
YES
5
YES
YES
5
YES
YES
5
YES
YES
5
YES
YES
5
YES
YES
5
3 - Clean and dry surfaces to be joined.
4 - Test fit joint and mark depth of fitting on outside of
pipe.
5 - Uniformly apply a liberal coat of PVC primer for PVC
or use a clean dry cloth for ABS to clean inside socket
surface of fitting and male end of pipe to depth of
fitting socket.
NOTE - Time is critical at this stage. Do not allow
primer to dry before applying cement.
6 - Promptly apply solvent cement to end of pipe and
inside socket surface of fitting. Cement should be
applied lightly but uniformly to inside of socket. Take
care to keep excess cement out of socket. Apply
second coat to end of pipe.
Page 15
CONCENTRIC
1-1.2 inch
2 inch
71M80
69M29
(US)
(US)
44W92
44W92
4
4
(CA)
(CA)
YES
2
YES
2
YES
2
YES
2
YES
2
YES
2
YES
2
YES
2
YES
YES
YES
YES
YES
YES
3 inch
60L46 (US)
44W93
4
(CA)
YES
YES
YES
YES
YES
YES

Advertisement

Table of Contents
loading

Table of Contents