Daikin FTKS09SL216 Service Manual page 76

Table of Contents

Advertisement

Service Manual
6.Remove electric box assy
Remove the 2 screws fixing the cover of elec-
tric box. Lift to remove the cover. Loosen the
wire and disconnect the terminal. Lift to re-
move the electric box assy.
7.Remove 4-way valve assy
Unscrew the fastening nut of the 4-way Valve
Assy coil and remove the coil. Wrap the 4-
way Valve Assy with wet cotton and unsolder
the 4 weld spots connecting the 4-way Valve
Assy to take it out.(Note: Refrigerant should
be discharged firstly.) Welding process
should be as quickly as possible and keep
wrapping cotton wet all the time. Be sure not
to burn out the lead-out wire of compressor.
8.Remove Electric Expansion Valve Sub-Assy
Unsolder weld point of Electric Expansion
Valve Sub-Assy,valve and outlet pipe of
condensator. Then remove the Electric
Expansion Valve Sub-Assy. Do not block the
Electric Expansion Valve when unsoldering it.
(Note: before unsoldering,discharge
refrigerants completely)
Installation and Maintenance
Electric box assy
4-way Valve Assy
Electric Expansion Valve Sub-Assy
73

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents