Lenovo ThinkAgile HX2320 Appliance User Manual page 60

Table of Contents

Advertisement

b.
Rotate the CMA out of the way to gain access to the power supply bay.
Step 3.
If there is a power-supply filler installed, remove it.
Figure 22. Hot-swap power supply filler removal
Step 4.
Slide the new hot-swap power supply into the bay until it snaps into position.
Figure 23. Hot-swap power supply installation
After installing the power supply:
1. Connect one end of the power cord to the new power supply connector; then, connect the other end of
the power cord into a properly grounded electrical outlet.
2. If the server is powered off, power on the server. Ensure that the power supply is replaced successfully:
• The amber warning LED on node front panel is off.
• The green indicator light on each power supply is illuminated.
• No errors are shown in the Lenovo XClarity Controller.
56
User Guide for ThinkAgile HX2320 Appliance and HX2321 Node

Advertisement

Table of Contents
loading

This manual is also suitable for:

Thinkagile hx2321 certified node

Table of Contents