Preparation For Installation; Mounting And Start-Up - Samson 42-34 Mounting And Operating Instructions

Differential pressure regulators with flow limitation
Table of Contents

Advertisement

Special storage instructions for elastomers
Elastomer, e.g. operating diaphragm
− To keep elastomers in shape and to pre-
vent cracking, do not bend them or hang
them up.
− We recommend a storage temperature of
15 °C for elastomers.
− Store elastomers away from lubricants,
chemicals, solutions and fuels.
Tip
SAMSON's After-sales Service can provide
more detailed storage instructions on re-
quest.

5.4 Preparation for installation

Proceed as follows:
Î Flush the pipelines.
Note
The plant operator is responsible for clean-
ing the pipelines in the plant.
Î Check the regulator to make sure that it
is clean.
Î Check the regulator for damage.
Î Check to make sure that the type desig-
nation, valve size, material, pressure rat-
ing and temperature range of the regula-
tor match the plant conditions (size and
pressure rating of the pipeline, medium
temperature etc.).
Î Check any mounted pressure gauges to
make sure they function.
EB 3013 EN
6.

Mounting and start-up

NOTICE
NOTICE
!
!
Risk of overheating due to excessive ambi-
ent temperatures or insufficient heat dissi-
pation when components are insulated.
− Do not include the regulator in the insula-
tion of the pipeline.
NOTICE
!
Risk of impaired functioning of the regula-
tor and leakage at the joint due to installa-
tion under tension.
− Bolt the regulator to the pipeline free of
stress.
− If necessary, support the pipelines near to
the connections.
− Do not attach supports directly to the regu-
lator.
Mounting and start-up
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

42-8

Table of Contents