Sequence Of Operation - International comfort products R8MXL Series Installation Instructions Manual

Hide thumbs Also See for R8MXL Series:
Table of Contents

Advertisement

(9.) Install NOx baffles (if removed).
(10.) Reinstall burner assembly. Center burners in cell
openings.
10. Remove old sealant from cell panel and collector box
flange.
11. Spray releasing agent on the heat exchanger cell panel
where collector box assembly contacts cell panel.
NOTE: A releasing agent such as cooking spray or equivalent
(must not contain corn or canola oil, aromatic or halogenated
hydrocarbons or inadequate seal may occur) and RTV sealant
(G.E. 162, 6702, or Dow−Corning 738) are needed before
starting installation. DO NOT substitute any other type of RTV
sealant. G.E. 162 (P771−9003) is available through RCD in 3−oz.
tubes.
12. Apply new sealant to flange of collector box and attach to
cell panel using existing screws, making sure all screws
are secure.
13. Reconnect wires to the following components. (Use con-
nection diagram on wiring label, if wires were not marked
for reconnection locations.):
a. Draft safeguard switch.
b. Inducer motor.
c. Pressure switch(es).
d. Limit over−temperature switch.
e. Gas valve.
f. Hot surface igniter.
g. Flame−sensing electrode.
h. Flame rollout switches.
i. Install NOx baffles (if removed).
14. Reinstall internal vent pipe, if applicable.
15. Reinstall vent connector on furnace vent elbow. Securely
fasten vent connector to vent elbow with 2 field−supplied,
corrosion−resistant, sheet metal screws located 180_ apart.
16. Replace blower access door only, if it was removed.
17. Set thermostat above room temperature and check furnace
for proper operation.
18. Verify blower airflow and speed changes between heating
and cooling.
19. Check for gas leaks.
20. Replace outer access door.
Fig. 46 − Cleaning Heat Exchanger Cell
441 01 6100 02
FIRE OR EXPLOSION HAZARD
Failure to follow this warning could result in personal injury,
death and/or property damage.
Never purge a gas line into a combustion chamber. Never
test for gas leaks with an open flame. Use a commercially
available soap solution made specifically for the detection of
leaks to check all connections.

SEQUENCE OF OPERATION

NOTE: Furnace control must be grounded for proper operation
or control will lock out. Control is grounded through
green/yellow wire routed to gas valve and manifold bracket
screw.
Using the schematic diagram, follow the sequence of operation
through the different modes. Read and follow the wiring diagram
very carefully.
NOTE: If a power interruption occurs during a call for heat (W),
the control will start a 90−sec blower−only ON period two
seconds after power is restored, if the thermostat is still calling for
gas heating. The amber LED light will flash code 12 during the
90−sec period, after which the LED will be ON continuous, as
long as no faults are detected. After the 90−sec period, the furnace
will respond to the thermostat normally.
The blower door must be installed for power to be conducted
through the blower door interlock switch ILK to the furnace
control CPU, transformer TRAN, inducer motor IDM, blower
motor BLWM, hot−surface igniter HSI, and gas valve GV.
1. Heating
The wall thermostat "calls for heat," closing the R−to−W
circuit. The furnace control performs a self−check, verifies
the pressure switch contacts PRS are open, and starts the
inducer motor IDM.
a. Inducer Prepurge Period− As the inducer motor
b. Igniter Warm−Up− At the end of the prepurge period,
c. Trial−for−Ignition Sequence− When the igniter
d. Flame−Proving− When the burner flame is proved at
A91252
Specifications are subject to change without notice.
WARNING
!
IDM comes up to speed, the pressure switch contacts
PRS close, 24 VAC power is supplied for a field in-
stalled humidifier at the HUM terminal and the control
begins a 15−sec prepurge period.
the Hot−Surface igniter HSI is energized for a 17−sec-
ond igniter warm−up period.
warm−up period is completed, the main gas valve re-
lay contacts GVR close to energize the gas valve GV,
the gas valve opens, The gas valve GV permits gas
flow to the burners where it is ignited by the HSI. Five
seconds after the GVR closes, a 2−second flame prov-
ing period begins. The HSI igniter will remain ener-
gized until the flame is sensed or until the 2−second
flame proving period begins.
the flame−proving sensor electrode FSE, the furnace
control CPU begins the blower−ON delay period and
continues to hold the gas valve GV open. If the burner
flame is not proved within two seconds, the control
CPU will close the gas valve GV, and the control CPU
will repeat the ignition sequence for up to three more
Trials−For−Ignition before going to Ignition−Lockout.
Lockout will be reset automatically after three hours
or by momentarily interrupting 115 vac power to the
furnace, or by interrupting 24 vac power at SEC1 or
SEC2 to the furnace control CPU (not at W, G, R, etc.)
If flame is proved when flame should not be present,
43

Advertisement

Table of Contents
loading

Table of Contents