General Discussion Of Mtp Optical Connector Handling - IBM Power 775 Service Procedure

D-link service procedure
Hide thumbs Also See for Power 775:
Table of Contents

Advertisement

2.3.1

General Discussion of MTP Optical Connector Handling

The MTP implementation of the MPO (Multi-Fiber Push-on/Pull-off) optical connector is a robust, rugged
optical connector with a long record of service worldwide over nearly two decades. However, there are several
factors that will greatly improve the effectiveness in using this optical connector.
CLEANLINESS IS
CRITICAL. Operation of an optical connector requires precise end-to-end alignment of
the two optical fibers, with little or no air gap in between. Fiber ends are pushed together with force of about 2
pounds, to minimize likelihood of air gaps. If dust or hair gets on the ends of the connectors, where the optical
fibers exit, it may block the light passing between fibers, or may push ferrules apart, causing larger gaps
between fibers. Therefore, it is important that the ends of the connectors are either kept clean, or are actively
cleaned before each connection. The following steps will help assure cleanliness, and will help ensure proper
signal integrity on all fiber lanes.
• Leave dust caps and dust covers on connectors and ports as much as possible,
• Ensure to never touch the end surfaces of the connectors, and
• Regularly use approved cleaning tools, such as the Fiber Optic Cleaning Tool shown below, preferably
before each and every connector insertion.
DON'T FORCE IT.
The Groupers, Push/Pull Tabs, and MTP Connector housings are made of plastic. The
plastic is high-quality, robust, and non-brittle, but parts may break if pushed or pulled too hard. Also, the PVC
cable jacket may separate from the connector housing, if it is pulled too hard. No operation in the insertion or
removal of an individual connector should require more than about 1 kilogram (9.8 Newtons / 2 pound) of
force – roughly equivalent to turning a doorknob. Always use the blue purple colored Push/Pull tabs for doing
the final actuation of connectors, both on insertion and removal.
LISTEN & FEEL FOR THE CLICKS.
where the connector is aligned with the LR-Port receptacle and pushed partway in, and 2. Final actuation,
where the latching fingers push the spring-loaded latching sleeve back, then ride over two latching nubs, and,
when past the latching nubs, release the spring-loaded latching sleeve so that it can slide over the latching
fingers. When this happens, there is an audible "click" as the latching sleeve hits its end of travel. If there is
not a "click", the connector is not fully connected, the fiber ends are not pressed together, and the connector
will not pass light well. Similarly, on removal, there is another "click", as the spring-loaded latching sleeve is
pulled back, releasing the latching fingers, and they snap over the latching nubs. On insertion of a LR-Link 8-
connector grouper, all connectors go through the initial actuation as a group. The final actuation is done
individually -- 8 push/pull tabs must be pushed separately, yielding 8 separate audible "clicks", for the whole
grouper to be fully connected. On removal, all 8 push/pull tabs must be pulled, yielding 8 separate audible
"clicks", before the grouper can be removed from the row of ports.
Power 775 D-Link Service Procedure
PN: 41U8487, EC N44172
MTP optical connectors operate in two steps: 1. Initial actuation,
9 of 27
Blue Head

Advertisement

Table of Contents
loading

Table of Contents