Quick Start Guide
GFK-2939A
5. Power-Up
When power is applied to the Energy Pack, the power-up
process goes through the following steps:
1.
The IN LED turns on green.
2.
The Energy Pack performs a
diagnostic test. If this test
output power to the Controller
turned on and the OUT LED
on (green).
3.
Charging of the Cap Pack
and the STAT LED blinks green.
4.
When charging of the Cap Pack is complete, the STAT LED
turns on solid green and the Energy Pack signals to the
controller that it can start run-time operation. The
Controller will not start running its application until the
Energy Pack signals that it is fully charged.
5.
If the Energy Pack is faulty or is not communicating, the
Controller will commence operations after a timeout period
(90 sec).
Power-up
Chapter 5
Sep 2019
self-
passes,
is
turns
begins
14