1 About this Documentation
1.1 Overview – target groups & product phases
The target groups, product phases and activities that can refer to this document
are marked in rounded boxes in the following figure.
Product
Selection
phases
Presales Aftersales
Design engineer
Programmer
Technologist
Target
Process
groups
specialist
Select
Prepare
Activities
Design
Construct
Fig. 1-1: Target groups, product phases and activities
1.2 Intended audience
This document explains technical and service personnel of the machine builder
how to safely install the system housing mechanically and electrically. This
document is not the usage manual.
1.3 Availability
These Instructions are part of the NYS04.1-ST-01-LMS-SERCOS-NY4079 system
housing product delivery and must always be available for the user. If the system
housing is handed over to another person, these Instructions must be handed
over as well.
Mounting
Engineering
(assembly/installation)
Mechanic/
electrician
Programmer
Commissioning engineer
Unpack
Parameterize
Mount
Program
Install
Configure
Simulate
About this Documentation
Commissioning
Operation
Technologist
Process specialist
Machine
operator
Maintenance
technician
Service
Optimize
Operate
Test
Maintain
Remove
faults
Create
the NC program
R911383228_Edition 04 Bosch Rexroth AG
1/27
Decommissioning
Mechanic/
electrician
Disposal company
Dismount
Dispose