Operating Instructions – Start-up
cushion pack
Am Riedweg 9a
D - 88682 Salem
CP 333 NTi
email: technik@cushionpack.com
Tel.: +49(0)7553 - 828 500
Fax: +49(0)7553 - 828 502
www.cushionpack.com

Advertisement

loading

Summary of Contents for Cushion Pack CP 333 NTi

  • Page 1 CP 333 NTi Operating Instructions – Start-up cushion pack Tel.: +49(0)7553 - 828 500 Fax: +49(0)7553 - 828 502 Am Riedweg 9a www.cushionpack.com D - 88682 Salem...
  • Page 2: Application And Installation

    CP 333 NTi Operating Instructions – Start-up Application and Installation: cushion pack cushion pack CP 333 NTi is used to make packaging padding from new cushion pack cushion pack cushion pack and used cardboard. Installation location and application can be changed as required.
  • Page 3 Electrical connection - commissioning A 230/240 Volt, 50/60 Hz, AC connection is required to operate the CP 333 NTi. A 2 metre cable with a plug is connected to the CP 333 NTi 10 A „inert“ fuses must be provided by the customer.
  • Page 4 CP 333 NTi Operating Instructions – Start-up Important Operating Instructions The package padding machine may be fed only with material such as corrugated cardboard or other boxes as well as paper of 60 g/m or more.
  • Page 5 CP 333 NTi Operating Instructions – Start-up...
  • Page 6 CP 333 NTi Operating Instructions – Start-up built-in dust extraction device on CP 333 NTi Once a week please clean here with a vacuum cleaner, remove plug before!
  • Page 7 Maintenance and service The CP 333 NTi must be checked at least once a year by an authorised person. The existence, quality and perfect function of all safety devices must be checked in intervals of two or three months for wear of moving parts and correct function of the complete electrical system.
  • Page 8: Important Safety Notes

    CP 333 NTi Operating Instructions – Start-up Important Safety Notes The package padding machine may not be operated by several persons at the same time ! All safety elements are designed for safe operation by one person.
  • Page 9 CP 333 NTi Operating Instructions – Start-up Important Maintenance and Cleaning Instructions Before opening the housing, for example, for cleaning and maintenance work, the machine is always first to be disconnected form the mains.
  • Page 10 Jürgen Degen Am Riedweg 9a D - 88682 Salem erklärt hiermit, daß nachstehend beschriebene Maschine: cushion pack CP 333 NTi übereinstimmt mit den Bestimmungen folgender EG - Richtlinien: Maschinenrichtlinie 98/37/EG und 91 / 368/EWG/2006/42/EG EMV-Richtline / EWG89/336-91/263/EMV, 92/31/EMV und 2014/35/EU Das oben genannte Gerät entspricht folgenden Normen bzw.