CP 320 S2i Operating Instructions – Start-up Application and Installation: cushion pack cushion pack CP 320 S2i is used to make packaging padding from new cushion pack cushion pack cushion pack and used cardboard. Installation location and application can be changed as required.
Page 3
Electrical connection - commissioning A 230/240 Volt, 50/60 Hz, AC connection is required to operate the CP 320 S2i. A 2 metre cable with a plug is connected to the CP 320 S2i. 10 A „inert“ fuses must be provided by the customer.
Page 4
CP 320 S2i Operating Instructions – Start-up Important Operating Instructions The package padding machine may be fed only with material such as corrugated cardboard or other boxes as well as paper of 60 g/m or more.
Maintenance and service The CP 320 S2i must be checked at least once a year by an authorised person. The existence, quality and perfect function of all safety devices must be checked in intervals of two or three months for wear of moving parts and correct function of the complete electrical system.
CP 320 S2i Operating Instructions – Start-up Important Safety Notes The package padding machine may not be operated by several persons at the same time ! All safety elements are designed for safe operation by one person.
Page 8
CP 320 S2i Operating Instructions – Start-up Important Maintenance and Cleaning Instructions Before opening the housing, for example, for cleaning and maintenance work, the machine is always first to be disconnected form the mains.
Page 10
Jürgen Degen Am Riedweg 9a D - 88682 Salem erklärt hiermit, daß nachstehend beschriebene Maschine: cushion pack CP 320 S2i übereinstimmt mit den Bestimmungen folgender EG - Richtlinien: Maschinenrichtlinie 98/37/EG und 91 / 368/EWG/2006/42/EG EMV-Richtline / EWG89/336-91/263/EMV, 92/31/EMV und 2014/35/EU Das oben genannte Gerät entspricht folgenden Normen bzw.