No.
Part name
Sensor wiring
∗ Bind TS sensor, TE sensor and TO sensor with
18
process
(Continued)
∗ Pass TE sensor and TO sensor through upper
NOTE)
Using the bundling band being on the market,
be sure to bind the position which was bound.
Pressure
1. Detachment
19
switch
1) Perform work of Detachment 1 of 1.
2) Recover the refrigerant gas from the outdoor unit.
3) Peform works of 2, 3 and 4.
4) Remove the soundproof plate, TD sensor,
Reactor on the partition plate and butyl on the pipe
of pressure switch.
Using a burner, remove the welded parts of
5)
the pipe of pressure switch.
NOTE)
Take care that the electric parts, 4-way valve unit,
butyle, compressor, accum tank, and etc. are not
caught by flame.
(Otherwise operaion trouble may occur.)
2. Attachment
• Be sure not to burn lead wire of the pressure switch.
• Take care there is no missing of sensor.
NOTE)
Take care that the body of the pressure is not
be 100°C or more.
For cooling pressure switch, use the wet towel
and etc.
Use the protective plate for the welding.
Procedure
the bundling band.
part of the inverter fixing board and then bind
them with the bundling band.
Bundling band
TS sensor
TE sensor
TO sensor
- 99 -
FILE NO. SVM-18051
Remarks
Inverter fixing board
Bundling band
TE sensor
TO sensor