Installation; Opening The Units; To Open The Gas Boiler; To Open The Switch Box Cover Of The Gas Boiler - Daikin EHYKOMB33AA Installation And Operation Manual

Hide thumbs Also See for EHYKOMB33AA:
Table of Contents

Advertisement

7 Installation

7
Installation
7.1

Opening the units

7.1.1

To open the gas boiler

2
1 Open the display cover.
2 Unscrew both screws.
3 Tilt the front panel towards you and remove the front panel.
7.1.2
To open the switch box cover of the gas
boiler
1 Open the gas boiler, see
"7.1.1 To open the gas
2 Pull the boiler controller unit forwards. The boiler controller will
tip downwards to provide access.
7.2

Mounting the gas boiler

INFORMATION
Removing the top plate of the indoor unit makes it easier to
install the gas boiler.
7.2.1

To install the gas boiler

1 Lift the unit from the package.
Installation and operation manual
12
2
2 Remove the top plate from the indoor unit.
3 The bracket to mount the boiler on the heat pump module is
already mounted to the backside of the gas boiler.
4 Lift the boiler. One person lifts the gas boiler on the left side (left
hand on the top and right hand on the bottom) and another
person lifts the gas boiler on the right side (left hand on the
bottom and right hand on the top).
5 Tilt the top of the unit at the position of the indoor unit mounting
bracket.
1
boiler" [ 4  12].
6 Slide the boiler downwards to fix the boiler bracket onto the
indoor unit mounting bracket.
36kg
Daikin Altherma hybrid heat pump – gas boiler module
4P353067-1K – 2020.10
EHYKOMB33A

Advertisement

Table of Contents
loading

Table of Contents