Start-Up Checklist - Bryant 564A Installation, Start-Up And Service Instructions Manual

3-phase packaged air conditioners
Table of Contents

Advertisement

I. PRELIMINARY INFORMATION
Model No. ...................................................................................................................................................................................................................
Serial No. ....................................................................................................................................................................................................................
Date .............................................................................................................................................................................................................................
Technician ...................................................................................................................................................................................................................
II. PRE-START-UP
___ Verify that all packing materials have been removed from unit
___ Verify that condensate connection is installed per installation instructions
___ Check all electrical connections and terminals for tightness
___ Check that indoor (evaporator) air filter is clean and in place
___ Verify that unit installation is level
___ Check fan wheel and propeller for location in housing and setscrew tightness
III. START-UP
Supply Voltage L1-L2 __________ L2-L3 _________ L3-L1 __________
Compressor Amps L1 __________ L2 _________ L3 __________
Indoor (Evaporator) Fan Amps __________
TEMPERATURE
Outdoor (Condenser) Air Temperature __________ DB
Return-Air Temperature __________ DB __________ WB
Cooling Supply Air __________ DB __________ WB
PRESSURES
Refrigerant Suction __________ psig
Suction Line Temp* __________
Refrigerant Discharge __________ psig
Discharge Temp† __________
___ Verify refrigerant charge using charging tables
* Measured at suction inlet to compressor
† Measured at liquid line leaving condenser
START-UP CHECKLIST (REMOVE AND STORE IN JOB FILE)