Install The Header Bracket - Chamberlain 5100-2K Owner's Manual

1/2hp
Table of Contents

Advertisement

Installation Step 2

Install the Header Bracket

• Center the bracket on the vertical guideline with
the bottom edge of the bracket on the horizontal
line as shown (with the arrow pointing toward the
ceiling).
Header
Wall
2x4
Structural
Support
2"
Highest
Point of Travel
(of Garage Door)
Highest
Point of Travel
(of Garage Door)
• Extend the vertical guideline onto the ceiling as
shown.
• Center the bracket on the vertical mark, no more
than 6" from the wall. Make sure the arrow is
pointing toward the wall. The bracket can be
mounted flush against the ceiling when clearance
is minimal.
• Mark holes designated for ceiling mount only. Drill
3/16" pilot holes and fasten bracket securely to a
structural support with the hardware provided.
The nail hole is for positioning only.
You must use lag screws to mount
the header bracket.
Fasten the Header Bracket to the Wall
Vertical
Center
Line
Header
Bracket
Vertical
Center
Line
Fasten the Header Bracket to the Ceiling
Ceiling Mounting Holes
CEILING MOUNT ONLY
UP
You can attach the header bracket either to the
wall above the garage door, or to the ceiling.
Follow the instructions which will work best for
your particular requirements.
• Mark either set of bracket holes (do not use the
holes designated for ceiling mount). Drill 3/16" pilot
holes and fasten the bracket securely to a structural
support with the hardware provided.
Lag Screws
5/16"x18x1-7/8"
Door
Spring
The nail hole is for positioning
only. You must use lag screws to
mount the header bracket.
Garage
Door
Vertical
Center
Line
Door
Spring
Garage
Door
14
CEILING MOUNT ONLY
UP
Optional
Wall Mounting
Holes
Hardware Shown Actual Size
Lag Screw
5/16"-18 x 1-7/8"
Vertical
Center Line
Header
Bracket
6" Maximum
Vertical
Center Line
Wall
Mounting Holes
Finished
Ceiling
Lag Screws
5/16"x18x1-7/8"
Header
Wall

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents