Gas Train Assembly - baltur TBG 50LX ME Instruction

Table of Contents

Advertisement

Available languages

Available languages

APPLICATION OF BURNER TO BOILER
HEAD UNIT ASSEMNLY
A) Adjust the position of connector flange 5 by loosening the
screws 6 so that the combustion head penetrates the advised
amount into the combustion chamber as recommended by the
generator's manufacturer.
B) Position the seal insulation 3 on the tube unit inserting cord 2
between flange and seal.
C) Fasten the Combustion Head unit 4 to the boiler 1 by means of
the stud bolts, washers and the nuts provided 7.
Note:Competely seal the space between the tube unit of the
burner and the hole in the refractory panel using suitable ma-
terials to do so.

GAS TRAIN ASSEMBLY

There are different assembly possibilities 8, 8a, 9 of the valves
train as shown in the diagram alongside.
Select the best position according to the particular arrangement of
the boiler room and the gas piping's entry position.
N.B. In the case of very large vales e.g. DN65 or DN80, make
sure there is sufficient support to prevent excessive stresses
on the gas train connector.
ASSEMBLYOFVENTILATION SYSTEM
A) Position the half-hinge on the burner scroll in line with those
on the combustion head assembly.
B) Put the hinge pin 10 in the position considered most suitable.
C) Connect the cables (switch on and ionisation) to the correspon-
ding electrodes, close the hinge, locking the burner by means
of screws 11.
23 / 66
000608328_20072
E
N
G
L
I
S
H

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tbg 80lx meTbg 110lx meTbg 140lx meTbg 200lx me

Table of Contents