Download Print this page

Toro Workman GTX Series Installation Instructions Manual page 3

Walk spreader mounting kit
Hide thumbs Also See for Workman GTX Series:

Advertisement

Installing the Walk-Spreader
Mount to the Rear of the
Machine
For Machines with a Plastic Cargo Bed
1. Install the 2 clip bushings to the spreader-mount frame
(Figure
2).
1. Spreader-mount frame
2. Slide the spreader-pivot shaft through the
spreader-mount frame and clip bushings
Note: Ensure that the holes on the spreader-pivot
shaft face upward.
1. Spreader-pivot shaft
3. Slide the left and right spreader ramps onto the
spreader-pivot shaft
Figure 2
2. Clip bushing
(Figure
Figure 3
(Figure
4).
1. Spreader-pivot shaft
4. Align the holes on the spreader-pivot shaft with the
holes on the left and right spreader ramps, and secure
them using the 4 flange-head screws (5/16 x 1-1/2
inches) and 4 flange nuts (5/16 inch) as shown in
Figure
5.
3).
1. Spreader ramp
2. Spreader-pivot shaft
5. Loosen the "T" handle on the receiver tube
1. Receiver tube
3
Figure 4
2. Spreader ramp
Figure 5
3. Flange-head screw ( 5/16
x 1-1/2 inches)
4. Flange nut (5/16 inch)
(Figure
Figure 6
2. "T" handle
6).

Advertisement

loading

This manual is also suitable for:

Workman 07029