Download Print this page

Bunn VP17A Operating & Service Manual page 4

Bunn vp17a: user guide

Advertisement

CAUTION - The brewer must be disconnected from the power source until specified in Initial Set-Up.
The brewer requires 2-wire, grounded service rated 220 - 240 volts ac, 20 amp,
single phase, 50 Hz. An all pole disconnect means must be incorporated in the fixed
wiring according to local wiring regulations. Proceed as follows:
CAUTION – Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayhead.
4. Feed the cord through the strain relief and connect it to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-
place the front panel.
CAUTION - The brewer must be disconnected from the power source throughout the initial set-up, except when
specified in the instructions.
1. Insert an empty funnel into the funnel rails.
2. Place an empty dispenser under the funnel.
3. Pour three pitchers of tap water into the screened area on top of the brewer. Allow approximately two minutes
between pitchers for water to flow into the tank. While the third pitcher of water is entering the tank, the tank
will fill to capacity and the excess will flow from the sprayhead, out of the funnel, and into the dispenser.
4. Connect the brewer to the power source.
5. When the flow of water from the funnel stops, wait approximately twenty minutes for the water in the tank to
heat to the proper temperature. Some water will drip from the funnel during this time; this is due to expan-
sion and should not occur thereafter.
6. Empty the dispenser and pour one pitcher of tap water into the screened area on top of the brewer.
7. After water has stopped flowing from the funnel, let the water in the tank reheat to the proper tempera-
ture.
8. Empty the dispenser. The brewer is now ready for use in accordance with the coffee brewing instructions
below.
ELECTRICAL REQUIREMENTS
ELECTRICAL HOOK-UP
INITIAL SET-UP
Page 4
10860.1 071598

Hide quick links:

Advertisement

loading