Plumbing Requirements - Bunn Single Operating & Service Manual

Bunn single: user guide
Hide thumbs Also See for Single:
Table of Contents

Advertisement

ELECTRICAL REQUIREMENTS
WARNING - The brewer must be disconnected from the power source until specified in Initial Set-Up.
Refer to Data Plate on the Brewer, and local/national electrical codes to determine circuit requirements.
WHITE
WHITE
NEUTRAL
NEUTRAL
L1 BLACK
L1 BLACK
GREEN
200 and 230 volt ac models
Note: This electrical service consists
of 2 current carrying conductors (L1
and L2) and a separate conductor
for earth ground.
ELECTRICAL HOOK-UP
CAUTION – Improper electrical installation will damage electronic components.
1. An electrician must provide electrical service as specified.
2. Using a voltmeter, check the voltage and color coding of each conductor at the electrical source.
3. Remove the front panel beneath the sprayhead.
Models with electronic control assemblies:
Place the tank heater switch at the top of the control assembly in the "OFF" position.
Models with electro/mechanical thermostats:
Rotate the control thermostat knob fully counterclockwise to the "OFF" position.
4. Feed the cord through the strain relief and connect it to the terminal block.
5. Connect the brewer to the power source and verify the voltage at the terminal block before proceeding. Re-
place the front panel.
6. If plumbing is to be hooked up later be sure the brewer is disconnected from the power source. If plumbing
has been hooked up, the brewer is ready for Initial Set-Up.

PLUMBING REQUIREMENTS

This brewer must be connected to a cold water system with operating pressure between 20 and 90 psi (138
and 620 kPa) from a
1
Install a regulator in the line when pressure is greater than 90 psi (620 kPa) to reduce it to 50 psi (138 kPa).
The water inlet fitting is
NOTE – Bunn-O-Matic recommends
feet from the
" water supply line. A tight coil of copper tubing in the water line will facilitate moving the brewer
1
2
to clean the counter top. Bunn-O-Matic does not recommend the use of a saddle valve to install the brewer. The
size and shape of the hole made in the supply line by this type of device may restrict water flow.
This equipment must be installed to comply with the Basic Plumbing Code of the Building Officials
and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the
Food and Drug Administration (FDA). For models installed outside the U.S.A., you must comply
L2 RED
N
L1 BLACK
L1
GREEN
GREEN
G
Note: This electrical service consists
of 2 current carrying conductors (L1
and L2) and a separate conductor
for earth ground.
" or larger supply line. A shut-off valve should be installed in the line before the brewer.
2
" flare.
1
4
" copper tubing for installations of less than 25 feet and
1
4
with the applicable Plumbing/Sanitation Code for your area.
L2 RED
L2
L1 BLACK
L1
GREEN
G
120 volt ac models
Page 4
L2 RED
L2 RED
WHITE
WHITE
NEUTRAL
NEUTRAL
L1 BLACK
L1 BLACK
GREEN
120/208 & 120/240 volt ac models
Note: This electrical service consists
of 3 current carrying conductors
(Neutral, L1 and L2) and a separate
conductor for earth ground.
" for more than 25
3
8
L2
N
L1
GREEN
G
27038 100407

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Single sng0005000

Table of Contents