Check For Leaks - Kohler K-3379 Installation Instructions Manual

Pillow talk power lite vitreous china toilet
Hide thumbs Also See for K-3379:
Table of Contents

Advertisement

Available languages

Available languages

F. REMOVE PACKING MATERIAL
Cut wire tie that retains the pump to the back wall of the
toilet. Remove wire tie and pump packing material.
NOTE: Do not remove the hose clamps on the pump
hoses.
If the pump shifted during shipping or installation, relocate
it so that it is not touching the back or side wall of the toilet.
G. CHECK FOR LEAKS
Turn shut-off valve on. Check for leaks.
Check all bowl and tank connections for leaks for several
days.
The nuts on the T-bolts may also require re-tightening.
BD
114252-2-
Check
Here For
Leaks
Shut-off Valve
Check Here
For Leaks
6
Wire Tie
Packing
Pump
Fig. #11
Fig. #12
Kohler Co., Kohler, WI U.S.A.

Advertisement

Table of Contents
loading

Table of Contents