Tools And Materials; Before You Begin - Kohler K-19796 Installation Manual

Table of Contents

Advertisement

Available languages

Available languages

Tools and Materials

Pencil
Tape
Measure
Safety
Glasses
Masking
Tape
Scissors
Thank You For Choosing Kohler Company
We appreciate your commitment to Kohler quality. Please take a few
minutes to review this manual before you start installation. If you
encounter any installation or performance problems, please don't
hesitate to contact us. Our phone numbers and website are listed on
the back cover. Thanks again for choosing Kohler Company.

Before You Begin

CAUTION: Risk of back injury. The tank must be installed
prior to moving the toilet into place. Because the tank is installed
prior to moving the toilet into place, the risk of injury when
installers move the toilet into place is greater.
IMPORTANT! Two people are required to lift this toilet into place,
as the tank must be installed prior to moving the toilet into the final
installation location.
IMPORTANT! This toilet does not fit standard toilet rough-ins.
Rough-in for this product is 7-1/2" (19.1 cm).
NOTE: The waste tube is meant to be attached to PVC tubing. It
will not attach properly to cast iron waste pipes.
This toilet does not install to a typical flange. It is designed to
install directly to PVC outlets only. No flange is needed.
Shut off the main water supply.
The supply location is not standard. Install the supply following
the rough-in diagram.
1052867-2-A
Hex
9/16" Drill
Drill
Wrench
Bit
PVC
Supply
Cement
Stop
2
Phillips
Screwdriver
Socket
Wrench
Kohler Co.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents