Install Support System; Connect Decorative Flue - Broan Rangemaster 63000EX Series Instruction Manual

Broan range hood installation 63000ex
Hide thumbs Also See for Rangemaster 63000EX Series:
Table of Contents

Advertisement

Available languages

Available languages

INSTALL SUPPORT SYSTEM

1. At hood location, install 2 x 4 cross framing
between ceiling joists using dimensions
shown.
2. Finish the ceiling surface. Be sure to mark
the location of the ceiling joists and cross
framing.
3. Position the support frame as shown. The
UP ARROW should point towards the ceiling
after installation.
4. Secure the support frame to joists and cross
framing with four screws provided (6x70mm)
and four washers (D. 6.4mm). Make sure
screws are driven into center of joists and
framing for maximum strength.
5. Adjust the overall height of the support frame.
Loosen and re-tighten the 4 screws in the
height adjustment slots as necessary.
Insert 4 screws (3.9x9.5mm) and 4 washers
(D.4.5mm) located in the Hardware
Package.
Note that the hood height is 10-1/4" and that
the bottom of the hood must be 24" min. and
30" max. above the cooktop.

CONNECT DECORATIVE FLUE

1. Secure the upper flue to the upper support
frame
with
(3,9x9,5mm).
2. Insert the lower flue moving it completely
towards the top and fix it temporarily with
retaining screw (3.9x9.5mm).
the
mounting
INSERT THE LOWER
FLUE
RETAINING SCREW
DRYWALL
9
13
/
"
16
WASHERS
(Ø6.4mm)
MOUNTING
SCREWS
(6x70mm)
FRONT
TOP VIEW OF SUPPORT FRAME
10
screws
- 7 -
CROSS FRAMING
CEILING
JOISTS
SUPPORT
FRAME
HEIGHT ADJUSTMENT
SLOTS
7
/
" (276mm)
8
7
13
/
16
(198mm)
MOUNTING SCREWS
(3.9X9.5MM)
UPPER FLUE
LOWER
FLUE
"

Advertisement

Table of Contents
loading

This manual is also suitable for:

63000ex series

Table of Contents