Wiring Connection - ABB TLE Scalable Series Installation Manual

40 to 150 kva ul s1
Table of Contents

Advertisement

30/54

4.8 Wiring connection

Note!
UPS installation and connection must be performed only by an ABB Service Technician!
Refer to the "Safety prescriptions - Installation" described on Chapter 1.
In case of UPS equipped with options or customized parts not covered by this manual, please
consult the appropriate technical documentation before proceeding with electrical connections.
Carefully read the following recommendations before proceeding:
• Ensure that the AC and DC external isolators are Off and prevent their inadverted operation.
• Do not close any external isolators prior to the commissioning of the equipment.
• The input/output cables must be connected in clockwise phase rotation for both Bypass and Rectifier Input
Bars if separate, taking care to avoid risk of short circuit between different poles.
• The grounding and neutral connection of the electrical system must be in accordance with local regulations.
• In case of additional cabinets containing Batteries, input/ output transformers, etc., their ground terminals
must be connected to the UPS main ground terminal.
• Once the power cables have been connected, re-install the internal safety shields and close the cabinets by re-
installing all external panels.
TLE Scalable Series 40 to 150 Access to the bus bars for the cable connections
A
B
Q1
Fig. 4.8-1 TLE Scalable Series 40 -150 - Access to connection bus bars
Note!
For UPS correct operation, the input Utility phase rotation must be clock-wise.
Please remove the plates "C" before drilling any wholes.
J35µP -
RS232
XA
Q1
Utility input & Battery / Output load
Please remove the plate (C)
before drilling any holes
TLE Scalable Series 40 to 150 UL S1
C
UPS Installation Guide / REV-B
To access Input, Output
and
Battery
connections
proceed as follows:
• Remove
the
protection panel "A".
• Remove
the
protection
panel
with the handle of the
switch
"Q1
output".
Remove the plate "C" to
make the holes for the
input and output cables.
front
front
"B"
UPS

Advertisement

Table of Contents
loading

Table of Contents