Service Clearances
Allow service clearances as indicated in the figures below. Refer to NEC and local guidelines for minimum clearances around the unit and
control panel.
Figure 1: Installation / Service Clearances.
Lifting
1. Before lifting, check that all shipping materials have been re-
moved from unit.
2. To assist in determining rigging requirements, see weights in
the table at right, or in the general specifications table in this
manual.
3. Always test-lift the unit to check for proper balance and rigging
before hoisting to desired location.
WARNING
• Failure to follow proper instructions could result in serious injury or death.
• Use the appropriate crane equipment to transport each unit; ensure the crane is capable of supporting the weights listed in the tables. If the
crane is not properly secured, it may result in an accident that causes physical injury or death.
Never lift the units in windy conditions.
• Wear protective gloves when handling equipment. Sharp edges may cause personal injury.
• Tear apart and throw away plastic packaging so that children may not play with them and risk suffocation and death.
Failure to follow proper instructions could result in property damage.
Due to our policy of continuous product innovation, some specifications may change without notification.
©LG Electronics U.S.A., Inc., Englewood Cliffs, NJ. All rights reserved. "LG" is a registered trademark of LG Corp.
INSTALLATION

Service Clearances, Lifting

Table 3: Weights.
Model No.
ARND153DCR4
Net Weight (lbs.)
ARND203DCR4
364
364
13