Appendix C Unit Dimensions - Daikin DBC Series Installation Instructions Manual

Light commercial packaged heating and cooling unit 7.5t to 12.5t
Hide thumbs Also See for DBC Series:
Table of Contents

Advertisement

Models
DBC/DBH090-120
DBC150
DBH150
Horizontal Discharge
For horizontal discharge, remove supply and return
For horizontal discharge, remove supply and return
duct cover panels from the end of the unit. Save
duct cover panels from the end of the unit. Save
all washered screws. According to the model size,
all washered screws. According to the model size,
remove (6 or 8) factory supplied panel clips that are
remove (6 or 8) factory supplied panel clips that are
secured to the base pan, behind the filter access
secured to the base pan, behind the filter access
panel. With the insulated side of the panel facing up,
panel. With the insulated side of the panel facing up,
attach the clips. Place the provided gasket material
attach the clips. Place the provided gasket material
completely around the perimeter of the clip side on
completely around the perimeter of the clip side on
both panels. Place the assembled panels over the
both panels. Place the assembled panels over the
supply and return duct openings in the base pan
supply and return duct openings in the base pan and
and push down to snap panels into place. Ensure
push down to snap panels into place. Ensure the
the panel is evenly seated on the flanges around the
panel is evenly seated on the flanges around the duct
duct openings and the gasket is
openings and the gasket is creating a good seal.
NOTE: Refer to IOD-7082 included in the literature pack for installing horizontal duct covers.

APPENDIX C UNIT DIMENSIONS

Dimension "A" in.
54-9/20
54-9/20
58-3/5
NOTE
NOTE
Vertical Discharge (Bottom of Unit)
40

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents