The Power-Up Sequence; Powering-Up The 3Com Switch 40X0; Checking For Correct Operation Of Leds - 3Com 4070 Getting Started Manual

Switch 40 series;
Hide thumbs Also See for 4070:
Table of Contents

Advertisement

28
C
2: I
HAPTER
NSTALLING THE
The Power-up
Sequence
Powering-up the
3Com Switch 40x0
Checking for Correct
Operation of LEDs
S
WITCH
existing unit. If you do not initialize the unit, problems may be caused
by conflicting Switch configurations.
When the Switch units are interconnected they are assigned a unit
number dependent on which XRN Interconnect Cable end is
connected to which Switch. That is, the Switch with the blue cable
end will be assigned the identity of Unit 1 and the Switch with the
yellow cable end will be assigned the identity of Unit 2.
For a detailed description of how XRN Technology operates and
implementation guidelines, please refer to the Implementation Guide on
the CD-ROM that accompanies your Switch or on the 3Com Web site.
The following sections describe how to get your 3Com Switch 40x0
powered-up and ready for operation.
Use the following sequence of steps to power-up the Switch.
1 Plug the power cord into the power socket at the rear of the Switch.
2 Plug the other end of the power cord into your power outlet.
The Switch powers-up and runs through its Power On Self Test (POST),
which takes approximately 10 seconds.
Repeat for the second power supply if it is fitted.
During the Power On Self Test, all ports on the Switch are disabled and
the LEDs light in a rapid sequence.
When the POST has completed, check the Unit Status to make sure that
your Switch is operating correctly.
LED.
Table 6 Unit Status Colors
Color
State
Green
The Switch is powered-up and operating normally.
Yellow
The Switch has failed its Power On Self Test (POST).
Off
The Switch is not receiving power.
Table 6
shows possible colors for the

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

3c177073c177083c17709

Table of Contents